Suzuki Grand Vitara SQ416/SQ420/420WD

Since 1998 of release

Repair and car operation



Suzuka Grandee Vitara
+ The general information
+ Maintenance service and greasing
+ Heater, ventilation and the conditioner
+ Steering
+ Suspension bracket
+ Wheels and tyres
+ Forward приводной a shaft shaft/bearing. An oil epiploon
+ Kardannye shaft
+ Brake system
+ Engines
+ Fuel system
+ Ignition system
+ Start system
+ Release system
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. An immobilizer
- Electric equipment
   + Body electric equipment
   + Illumination system
   - Electric equipment system
      + The general description
      + Diagnostics
      + The works made on the car
      - Major repairs
         - The generator
            Removal
            Installation
            Dismantling [Type 60 A]
            Dismantling [Type 70 A and 80 A]
            Survey [Type 60 A]
            Survey [Type 70 A and 80 A]
            Replacement of brushes
            Assemblage [Type 60 A]
            Assemblage [Type 70 A and 80 A]
      + Specifications
      The inhaling moments
   + Tools/information for drivers




Assemblage [Type 60 A]

 PERFORMANCE ORDER

  1. Collect in an order opposite to dismantling, having paid attention to the following.
  2. Necessarily establish brushes in a correct direction and solder wires of brushes and contacts статора.
1 — статор
2 — a brush
3 — щеткодержатель
4 — solder
5 — a brush spring
1 — статор
2 — a brush
3 — щеткодержатель
4 — solder
5 — a brush spring
  1. Tighten a nut of a pulley of the generator with the specified moment of an inhaling. An inhaling twisting moment (a): 118 Н•м (11.8 kg th, 85.5 pounds-foots).
  • Using a vice, place a pure fabric between a rotor and a vice not to damage a rotor.
  • Necessarily keep a rotor in point A. Do not keep it in a zone In, as it insufficiently strong.

1 — a pulley nut
2 — a rotor
3 — a fabric
4 — a vice
  1. Insert brushes in щеткодержатель, then support brushes, having inserted a corresponding wire from an aperture in a back casing.
  • After rotor installation, remove a wire.
  • Check up and be convinced that marks of combination in a forward and back casing are levelled.
  • Do not put greasing on back (роторный) the bearing. Completely clean oil if it is in the bearing of a back casing.

1 — a back casing
2 — a wire
  1. After generator assemblage, be convinced that the rotor rotates smoothly.