Suzuki Grand Vitara SQ416/SQ420/420WD

Since 1998 of release

Repair and car operation



Suzuka Grandee Vitara
+ The general information
+ Maintenance service and greasing
+ Heater, ventilation and the conditioner
+ Steering
- Suspension bracket
   + Forward suspension bracket
   - Back suspension bracket
      The general description
      + Diagnostics
      - Service out of a workshop
         The shock-absorber
         Cylindrical spring
         The bottom draught
         The top draught
         Lateral draught
         The back bridge and the wheel bearing
         Internal oil epiploon of the back bridge
         The case of the back bridge
+ Wheels and tyres
+ Forward приводной a shaft shaft/bearing. An oil epiploon
+ Kardannye shaft
+ Brake system
+ Engines
+ Fuel system
+ Ignition system
+ Start system
+ Release system
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. An immobilizer
+ Electric equipment




The back bridge and the wheel bearing

Removal

 PERFORMANCE ORDER

  1. Remove a drum of a back brake. See Has undressed the Brake drum (Removal) in the Head the Lay and back brake more in detail.
  1. Merge oil from the bridge case, having weakened a drain stopper.
  1. Remove nuts (1) stoppers of the bearing of a back wheel from the bridge case.
  1. Remove the gauge of speed of a wheel (1) from the case of the back bridge (if there is a system of antiblocking of brakes ABS).

  • At removal of the gauge of speed of a back wheel do not pull and excessively do not overwind a wire.
  • Do not damage a surface of the gauge of speed of a back wheel or a rack and try, that the dust and a dirt have not got to its adjusting aperture.

  1. Check up that there is a backlash between a stopper of the bearing of a back wheel (1) and the lever Pads a lay brake (2). If the backlash (3) is not present, ослабьте a cable counternut so that there was a backlash.
  1. By means of the special tool (B) and (C) pull out the bridge.
    • The special tool:
      • (C): 09943-35512
      • (B): 09942-15510

Operate cautiously that together with bridge not to pull out a brake plate.


Pull out the bridge cautiously not to hook on the top both bottom brake racks and a lay cable.


  1. The pulled out shaft of the back bridge.
    • Length of a shaft “L”:
      • Left-hand side: 711.5 mm (28.0 inches)
      • The right party: 757.5 mm (29.8 inches)
  1. If there is a system of antiblocking of brakes ABS to remove a rotor of the gauge from a lock ring, grind the grinding tool one part of a rotor of the gauge until it does not become thin.
  1. Break a chisel истонченную a part of a rotor of the gauge to remove it (if there is a system of antiblocking of brakes ABS).
  1. To remove a lock ring (1) from a shaft (3), grind the grinding tool two parts (2) lock rings of the bearing (1) until they do not become thin.

Be not overzealous with polishing not to damage a shaft.


  1. Break a chisel истонченную a part of a lock ring to remove it.
  1. Remove the bearing (2) from a shaft (1) by means of a hydraulic press (3).
  1. Remove a bearing stopper.
  1. By means of a hydraulic press (2) remove a hairpin (hairpins) (1).

Installation

 PERFORMANCE ORDER

  1. Establish the removed parts upside-down, paying attention to the following:
  2. Put greasing on edge of an oil epiploon.

The quantity of the greasing put in a cavity of an oil epiploon, should occupy more than 60 % of its empty seat. “A”: greasing 99000-25010.


1 — a bearing stopper
2 — an oil epiploon
3 — the wheel party
4 — the differential party
  1. Having combined мелкозубчатое connection between new (new) a hairpin (hairpins) (1) and a flange (4), establish new (new) a hairpin (hairpins) (1), having tightened a nut.
1 — a hairpin
2 — a nut
3 — a washer
4 — a flange
  1. Establish a stopper of the bearing (2) on a shaft (1).
  1. By means of a press establish the bearing of a wheel (1) and a lock ring (2).
  • Operate cautiously not to damage an outer side of a lock ring.
  • Establish the wheel bearing in a correct direction.

The car without system of antiblocking of brakes ABS.
The car with system of antiblocking of brakes ABS.
  1. For the car with system of antiblocking of brakes ABS, establish by means of a press a new rotor of the gauge (1).

Operate cautiously not to damage an outer side of a lock ring.

  1. Put greasing on internal edge of an oil epiploon of a shaft. “A”: greasing 99000-25010.
A — the Car without system of antiblocking of brakes ABS
B — the Car with system of antiblocking of brakes ABS
  1. Put hermetic on an adjoining surface of a stopper of the bearing (1) with a brake plate.

Before drawing of new hermetic clear a surface of the old. “B”: hermetic 99000-31110.


  1. Establish a shaft of the back bridge in the case of the bridge and tighten nuts of a stopper of the bearing to the specified value of the moment of an inhaling. The inhaling moment: a stopper nut (a): 23 Н•м (2.3 kg th, 17.0 pounds-foots).

At installation of the back bridge operate cautiously not to damage edge of an oil epiploon in the bridge case.


  1. Tighten a bolt of the gauge of speed of a wheel to the specified value of the moment of an inhaling (if there is a system of antiblocking of brakes ABS). The inhaling moment: a bolt of the gauge of speed (b) — 21 Н•м (2.1 kg th, 15.5 pounds-foots).
  1. Fill the case of the back bridge (differential) new, specified in Section Servicing in the Head Back differential, oil.
  2. Establish a brake drum as it is described in the Head the Lay and back brake, in Section the Brake drum.