Suzuki Grand Vitara SQ416/SQ420/420WD

Since 1998 of release

Repair and car operation



Suzuka Grandee Vitara
+ The general information
+ Maintenance service and greasing
+ Heater, ventilation and the conditioner
+ Steering
+ Suspension bracket
+ Wheels and tyres
+ Forward приводной a shaft shaft/bearing. An oil epiploon
+ Kardannye shaft
+ Brake system
+ Engines
+ Fuel system
+ Ignition system
- Start system
   + The general description
   - Diagnostics
      Block repair
      Analysis
      Assemblage
      Survey
      Work check
      Specifications
      Type 0.9 кВ
   Necessary materials
   The special tool
+ Release system
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. An immobilizer
+ Electric equipment




Assemblage

  • It is not authorised to wash out, regulate or assort the shock-absorber (a disk муфты coupling).
  • New bearings without greasing have been greased, when were delivered as spare parts. Do not wash out маслорастворителем and do not grease with other lubricant substance.

 PERFORMANCE ORDER

  1. Check up components (Survey see) and replace on new if necessary.
  2. Put greasing (the Starter see).
  3. Establish an anchor on a collar.
  4. Establish brushes and springs of brushes on щеткодержатель.
  5. Establish щеткодержатель on an anchor, squeezing out 4 brushes outside.
1 — a brush
2 — a brush spring
3 — щеткодержатель
  1. Establish a back sleeve and then a cap back скобы.
  2. Establish back скобу.
  3. Tighten screws щеткодержателя.
1 — back скоба
2 — screws щеткодержателя
  1. Establish assemblage обгонной муфты on a shaft - a gear wheel, paying attention to a direction of installation of a lock ring of a gear.
1 — обгонная муфта
2 — a lock ring of a gear
3 — a persistent ring
4 — a shaft-gear wheel
  1. Insert shaft assemblage into a forward casing, lever position.
1 — lever assemblage
2 — the lever
  1. Establish a lining so that cuts in it were combined with apertures for through bolts in a forward casing.
  2. Establish a plate and rubber consolidation in a forward casing.
1 — a lining
2 — planetary transfer
3 — an aperture for a bolt
4 — rubber consolidation
  1. Put greasing on a ball and establish a ball in a shaft aperture.
1 — a ball
  1. Establish a collar, an anchor, щеткодержатель and back скобу in a forward casing, having combined the marks put before removal.
  2. Tighten through bolts.
1 — bolts
2 — reducer assemblage
  1. Establish assemblage of the electromagnetic switch and a protector (if is). Connect a wire (to the motor) to a switch conclusion.
  2. After the termination of assemblage inspect work.
1 — the electromagnetic switch
2 — a protector