Suzuki Grand Vitara SQ416/SQ420/420WD

Since 1998 of release

Repair and car operation



Suzuka Grandee Vitara
+ The general information
+ Maintenance service and greasing
+ Heater, ventilation and the conditioner
+ Steering
+ Suspension bracket
+ Wheels and tyres
- Forward приводной a shaft shaft/bearing. An oil epiploon
   The general description
   + Diagnostics
   - Service out of a workshop
      Power shaft
      The shaft bearing / an oil epiploon
   Specifications of the moment of an inhaling
   Material necessary for service
   The special tool
+ Kardannye shaft
+ Brake system
+ Engines
+ Fuel system
+ Ignition system
+ Start system
+ Release system
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. An immobilizer
+ Electric equipment




The shaft bearing / an oil epiploon

Removal

 PERFORMANCE ORDER

  1. Remove a power shaft.
See in the given Chapter Has undressed the Power shaft.
  1. To remove the shaft bearing / an oil epiploon on the right side, lower differential oil.
  2. The lever for tyres remove the left power shaft.
  3. Remove the left rack. The Section a shock-absorber Rack in the Head the Suspension bracket see.
1 — the left power shaft
2 — the lever for tyres
  1. Screw-driver remove an oil epiploon.
  2. Remove a cutting lock ring.
1 — an axial oil epiploon
2 cutting lock ring
3 axial bearing
  1. By means of special tools (A) and (B) remove the bearing.
    • The special tool:
      • (A): 09941-64510
      • (B): 09930-30102
1 — the shaft bearing

Installation

 PERFORMANCE ORDER

  1. Clear an oil epiploon of a power shaft and put литиевую plastic greasing. Check up an oil epiploon on damages and breakages. If necessary, replace. “A”: greasing 99000-25010.
  1. Insert the power shaft bearing the special tool (A) (on the left side). The special tool (A): 09913-75520.
  2. Establish a cutting lock ring.
1 — the shaft bearing
  1. By means of the special tool (B) and (C) insert an oil epiploon.
    • The special tool
      • (B): 09951-16090
      • (C): 09924-74510

As depth on which the oil epiploon in the shaft case is established, different on the right and at the left, check up put on the special tool (B) labels and establish each oil epiploon at level of a corresponding label.


1 — an oil epiploon of a shaft
2 — the right party
3 — a left-hand side
  1. Establish the left power shaft.
  1. Establish the left rack. Subitem 1 see - 2 installations were undressed by a shock-absorber Rack in the Head the Suspension bracket.
  2. Establish a power shaft. See in the given Chapter the Power shaft (Installation) Has undressed.
  3. Fill the differential case with the specified oil for differential to the specified level.